International Services, LLC phone  
   
 



 

 

 

IS successfully completed a 235 KV capacitor bank upgrade projects for Western Area Power Administration (WAPA)

 

WAPA in the state of Arizona provided IS with a very challenging and interesting project. WAPA has two capacitor banks located in Arizona which had a serious failure preventing operation of both banks. Scope of this upgrades project includes:

 

  • Initiated the engineering walk dow

  • Scavenged documentation and deciphered the rest

  • Mobilized a prep team to identify and label the entire system that was to be modified

  • Design teams worked in tandem designing the new system and developing conversion plans while the other team developed the PLC code.

  • Engineered a new protocol to interface new to old.

  • Performed multiple layers of testing at ISI facilities and then invited WAPA team to witness the testing.

  • Performed system installation

  • After successful field commissioning of the new system configuration, both capacitor banks went on line May 30th, 2008 without incident.

 

 

 

 

IS recently successfully completed a project
at VA Hospital in Orlando, Florida

 

  • Central Energy Plant for VA hospital Campus

  • Over 20M Watts available from Caterpillar Diesel Engine Generators for Emergency situations

  • 85 sections of Siemens medium voltage switchgear customized by Industrial Power Systems

  • GE RX3i PLC Controlled with redundant master controllers and 10 individual controllers

  • SCADA is Wonderware-based with redundant servers and 6 operator stations

 

 
  • Close to 10,000 tags

  • Over 500 screens

  • Over 250 devices networked utilizing Modbus/ Modbus TCP protocols

  • Power meters

  • Protective relay

  • IP Cameras

  • Caterpillar Generator Controllers

  • Woodward governors and synchronizers with load sharing

  • ASCO Automatic Transfer Switches

 

 

 

 

   
   